Image from Google Jackets

Prediction analysis of schedule delay percentage in capital projects using data mining techniques / by Mohammed Siraj Eddin Shikhli ; supervisor Ahmed Mohammed Hammad.

By: Contributor(s): Material type: TextTextPublication details: , 2018.Description: xi, 12-108 leaves : ill. (col.) ; 30 cm.+ 1 CD-Rom ( 4 3/4 in.)Subject(s): LOC classification:
  • TH438.4 .S555 2018
Online resources: Dissertation note: Thesis (M.Sc.) --University of Sharjah, 2018.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Barcode
Dissertations University of Kalba TH438.4 .S555 2018 (Browse shelf(Opens below)) Library use only 00-1-322263

Thesis (M.Sc.) --University of Sharjah, 2018.

Bibliography : leave 103-108.

This thesis is submitted in partial fulfilment of the requirements for the degree of M.Sc. in Engineering Management in the Department of Industrial Engineering and Engineering Management, University of Sharjah ; under the supervision of Dr. Ahmed Mohammed Hammad.

Abstract in English.

There are no comments on this title.

to post a comment.

© 2025 University of Kalba. All Rights Reserved.