000 | 01596ntm a2200361 a 4500 | ||
---|---|---|---|
005 | 20250421080231.0 | ||
008 | 180222s2017 ts ae bm 000 0 eng d | ||
037 | _cGift | ||
040 |
_aAE-ShU _cUKB |
||
041 | 0 |
_aeng _bara |
|
043 | _aa-ts--- | ||
050 | 4 |
_aTH438 _b.H393 2017 |
|
100 | 1 | _aAl-Hawarneh, Alaa Maher | |
245 | 1 | 0 |
_aDynamic facilities planning model for large-scale construction projects in UAE / _cby Alaa Maher Al Hawarneh ; supervisors Salaheddine Bendak, Firas Ghanim. |
260 | _c2017. | ||
300 |
_axiv, 156 leaves : _bill. (col.) ; _c30 cm. + _e1 CD-Rom (4 3/4 in.) |
||
365 |
_b100.00 _cAED |
||
502 | _aThesis (M.Sc.)--University of Sharjah, 2017. | ||
504 | _aIncludes bibliographic references (leaves 106-108). | ||
546 | _aIncludes abstracts in English and Arabic. | ||
610 | 2 | 4 |
_aUniversity of Sharjah _xDissertations. |
650 | 0 |
_aConstruction industry _xManagement _zUnited Arab Emirates |
|
650 | 0 |
_aBuilding _xSuperintendence _zUnited Arab Emirates. |
|
650 | 0 | _aProduction scheduling. | |
650 | 0 | _aProject management. | |
650 | 0 |
_aConstruction contracts _zUnited Arab Emirates. |
|
700 | 1 |
_aBendak, Salaheddine, _esupervisor |
|
700 | 1 |
_aGhanim, Firas _esupervisor |
|
710 | 2 |
_aUniversity of Sharjah. _bCollege of Engineering. _bDepartment of Industrial Engineering and Engineering Management. _gM.Sc. |
|
850 | 4 |
_uhttps://myuos.sharjah.ac.ae/en/library/Online%20Books/Thesis/b1269423x.pdf _zFull Text |
|
856 |
_uhttps://uos-theses.sharjah.ac.ae/Files_Pool/Theses/Flip/1269423/mobile/index.html _zFull Text |
||
942 | _cDIS | ||
999 |
_c15381 _d15381 |