000 01690ntm a2200313 4500
005 20250421080335.0
008 190312s2018 ts a bm 000 0 eng d
037 _bGift
040 _aAE-ShU
_cUKB
043 _aa-ts---
050 4 _aTH438.4
_b.S555 2018
100 1 _aShikhli, Mohammed Siraj Eddin
245 1 0 _aPrediction analysis of schedule delay percentage in capital projects using data mining techniques /
_cby Mohammed Siraj Eddin Shikhli ; supervisor Ahmed Mohammed Hammad.
260 _a,
_c2018.
300 _axi, 12-108 leaves :
_bill. (col.) ;
_c30 cm.+
_e1 CD-Rom ( 4 3/4 in.)
502 _aThesis (M.Sc.) --University of Sharjah, 2018.
504 _aBibliography : leave 103-108.
500 _aThis thesis is submitted in partial fulfilment of the requirements for the degree of M.Sc. in Engineering Management in the Department of Industrial Engineering and Engineering Management, University of Sharjah ; under the supervision of Dr. Ahmed Mohammed Hammad.
546 _aAbstract in English.
610 2 4 _aUniversity of Sharjah
_xDissertations.
650 0 _aConstruction industry
_zUnited Arab Emirates
_xManagement.
650 0 _aProduction scheduling
_zUnited Arab Emirates
650 0 _aConstruction projects
_zUnited Arab Emirates
700 1 _aHammad, Ahmed Mohammed,
_esupervisor
710 2 _aUniversity of Sharjah.
_bCollege of Engineering.
_bDepartment of Industrial Engineering and Engineering Management.
_gM.Sc.
850 4 _uhttps://myuos.sharjah.ac.ae/en/library/Online%20Books/Thesis/b12799713.pdf
_zFull Text
856 _uhttps://uos-theses.sharjah.ac.ae/Files_Pool/Theses/Flip/1279971/mobile/index.html
_zFull Text
942 _cDIS
999 _c16459
_d16459